Bantalan industri solusi

Coupling Mounting And Dismounting Kit

Mounting and dismounting

1. The coupling is put into position. High pressure injectors are connected to A, and a low pressure to the hydraulic chamber B (fig 1).
2. Oil is injected into A under high pressure, building up an oil film between the inner and outer sleeves, eliminating metallic contact and reducing friction forces (fig 2).
3. When there is a good oil film between the sleeves, oil leaks out at the thick end of the inner sleeve. Oil is pumped into B and the outer sleeve starts moving up the taper. Oil is continuously injected between the sleeves (A), in order to avoid metallic contact (fig 3).
4. The coupling has reached its final position when the outer diameter of the coupling has grown by a predetermined value. The oil pump is stopped, but pressure in B must remain.
5. When oil has drained from the contact surfaces of the two sleeves and friction has been restored, low pressure B is released. All oil connections are plugged. The exposed parts of the coupling are covered with a rust preventive and the coupling is ready for years of trouble-free operation (fig 4).

Skype Hubungi Sekarang
Kategori Produk
Bola bantalan rol
Runcing Roller bantalan
Dalam alur bantalan bola
Bantalan perumahan
Dalam alur bantalan bola
perumahan bantalan
Dalam alur bantalan bola
Runcing Roller bantalan
Silinder Roller bantalan
bantalan biasa
Bantalan biasa
dorong roller bantalan
Silinder Roller bantalan
Dalam alur bantalan bola
Silinder Roller bantalan
Menyelaraskan diri bantalan bola
Bantalan bola kontak sudut
Dorong bantalan bola
Bantalan bola untuk sudut
Bantalan gulung jarum
Bantalan bola kontak sudut
Bantalan gulung jarum
Runcing roller bantalan
Bola bantalan rol
Runcing Roller bantalan